Cell Register

Building management system

Runs the heating, ventilation, air handling and room conditions of the building, including the clean and cold areas production depends on.

How the register reads it

Also calledBMS, HVAC control, building automation
FamilyBuilding and utility plant
What a wrong action costsbatch, line. A room out of specification and the product in it, and a plant that has to stop.
Zone class and SL-Tbusiness SL-T 3 by default (2 for the class, raised one because the class is reached remotely by default). Almost always installed on the office side of the boundary; it belongs on its own zone with a conduit to the plant. Never above 3; the paste may state its own zone name and SL-T.
Networked by defaultYes. A networked system by construction, usually reachable from the office.
Remote access by defaultYes. Facilities contractors connect remotely as the norm; the paste decides.
Behaviour by defaultfixed. Schedules and set points; fixed-program unless the paste names an optimiser that learns.
Machinery RegulationA controller, a server or a sensor that is not itself a machine or a safety component carries no Machinery Regulation row; the machine it controls does.
Safety references
  • ISO 12100 risk assessment and risk reduction for machinery
Named, not held: the register does not say whether a machine was built to them.

What each regime attaches, and who it binds

49 clauses across 4 regimes, on the class defaults

Shown on a register for the regimes you tick; with none ticked, the IEC 62443 asset-owner rows are the default. The CRA row is informational on every connected asset. Requirement text drawn from a human-verified compliance corpus under licence: the corpus statement of each clause, not the instrument verbatim.

IEC 62443

Binds Part 2-1 binds the asset owner; Part 3-2 is the owner's zoning and risk assessment; Part 3-3 is what the owner specifies for the system. Part 2-4 binds the service provider and Parts 4-1 and 4-2 the product supplier, so those rows are rendered as what to ask. Source framework: IEC 62443.

Asset owner dutyOn every asset (Part 2-1)
IEC 62443 2-1 AC · 2-1 BCP · 2-1 CSMS · 2-1 IR · 2-1 MOC · 2-1 NSEG · 2-1 PHY · 2-1 PM · 2-1 RA · 2-1 TRN
Whatever the zone, these ten programme duties are the owner's for every asset in the system under consideration.
Asset owner dutySystem requirements to specify for the site business zone (Part 3-3)
IEC 62443 3-3 SR 1.1 · 3-3 SR 2.1 · 3-3 SR 5.2 · 3-3 SR 6.1
An asset on the business side of the boundary is inside the CRS for what it can reach across it: identification, use control, the zone boundary and accessible logs.
Asset owner dutyAdded where the asset is on a network
IEC 62443 3-3 SR 3.1 · 3-3 SR 5.2 · 3-3 SR 6.2
Communication integrity, a monitored zone boundary and continuous monitoring attach the moment the asset is reachable.
Asset owner dutyAdded where the asset is reached remotely
IEC 62443 2-1 AC · 3-3 SR 1.1 · 3-3 SR 6.1
The remote account, its authentication and the record of its sessions are the owner's.
Ask the integratorPart 2-4 binds the service provider, not the owner
IEC 62443 2-4 SP-01 · 2-4 SP-02 · 2-4 SP-03 · 2-4 SP-04 · 2-4 SP-05 · 2-4 SP-06
The owner owes none of these rows; the owner asks the integrator and the maintenance provider for the evidence of each before commissioning and at every substantial change.
Ask the supplierPart 4-1 binds the supplier, not the owner
IEC 62443 4-1 DM · 4-1 SG · 4-1 SUM
The owner asks the maker of the controller or the machine for the hardening guide, the vulnerability handling process and the signed update channel.
Ask the supplierPart 4-2 binds the supplier: a networked component
IEC 62443 4-2 CR-1-1 · 4-2 EDR-3-10
For a networked controller the owner also asks for signed firmware with rollback protection and user authentication on the component.

NIST SP 800-82 Rev 3

Binds guidance addressed to the operator of the OT environment: it binds nobody in law and is what most OT security programmes are assessed against. Source framework: NIST SP 800-82 Rev 3.

Asset owner dutyThe OT overlay on every asset
SP 800-82 GOV-3 · HOST-4 · HOST-6 · IR-1 · MON-2
SP 800-82 is guidance for the operator of the OT environment: an inventory that holds firmware and location, safety and security run together, change and patch management, and an incident plan with OT scenarios.
Asset owner dutyNetwork architecture where the asset is on a network
SP 800-82 ARCH-1 · ARCH-2 · NET-1
Zones and conduits, an industrial DMZ between the plant and the office, and deny-by-default rules between zones.
Asset owner dutyRemote access where the asset is reached remotely
SP 800-82 RA-1 · RA-2
A brokered, authenticated, recorded, time-bounded path; vendor accounts named individually and enabled just in time.
Asset owner dutyBuilding and utility plant
SP 800-82 SECTOR-2
Building and utility systems share the characteristics of the line and are the ones most often left on the corporate network.

The EU Cyber Resilience Act

Binds manufacturers, importers and distributors of products with digital elements; never the owner using them. Source framework: the EU Cyber Resilience Act.

Ask the supplierFrom the application date (the CRA binds manufacturers)
CRA Art. 13 and Annex I · Art. 69, 70, 71
A connected controller or machine with digital elements is a product with digital elements; the manufacturer owes the essential cybersecurity requirements, a support period with security updates and vulnerability handling. The owner asks for the support period and the update channel. Informational: the owner owes no CRA clause.

ISO/IEC 27001:2022

Binds the organisation that holds the certificate, through the Annex A controls it declared applicable. Source framework: ISO/IEC 27001:2022.

Asset owner dutySupplier and change controls on every asset
ISO 27001 5.19 · 5.20 · 5.22 · 8.32
The integrator and the maintenance provider are suppliers; the change to a machine is a change.
Asset owner dutyNetwork controls where the asset is on a network
ISO 27001 5.21 · 8.9 · 8.20 · 8.21 · 8.22
Network security, the services on it, segregation and a secure configuration baseline attach to any connected asset; the ICT supply chain control attaches to what the supplier delivers into it.

The EU AI Act

A fixed-program machine is not an AI system: it does not infer from input how to generate its output and it does not learn or re-plan at runtime. No AI Act row attaches to it; the Machinery Regulation and IEC 62443 do.

Runtime attestation: what to ask the supplier for

Signed firmware and updates with rollback protection, an attested boot or integrity check the controller reports, and behaviour logs that can be read off the device. The register asks; it does not say the supplier provides any of it. CRA Art. 13 and Annex I IEC 62443 3-3 SR 3.3 · 3-3 SR 3.4 · 4-1 SUM · 4-2 EDR-3-10

Ask the integrator

  1. What the contractor's remote session can change
  2. Whether it shares a network with a line controller
  3. Who owns its set points

Findings this class can raise

Do this for every asset on your floor

Paste the list and get this classification for every asset at once, with the zone and SL-T, the behaviour, the connectivity, the findings and the obligation rows per regime. Eight assets free, no account.

Build my cell register

Boiler and burner control · Compressed air and pump station