Welding robot
Moves a welding torch or gun along a taught seam inside a fenced cell, with fume extraction and a positioner.
How the register reads it
| Also called | weld cell, robotic welder |
|---|---|
| Family | Robot arms and cobots |
| What a wrong action costs | person, batch, line. A person in the cell, arc and fume exposure, a scrapped part; the cell is a line bottleneck. |
| Zone class and SL-T | cell SL-T 2 by default. One fenced cell with its own controller and welding power source. Never above 3; the paste may state its own zone name and SL-T. |
| Networked by default | Yes. Weld controllers report to the line and take programs from an engineering workstation. |
| Remote access by default | No. The integrator's request; the paste decides. |
| Behaviour by default | fixed. Seam programs are taught; fixed-program unless the paste says the cell adapts its parameters. |
| Machinery Regulation | A machine or safety component: the declaration, the technical documentation and the instructions are demanded at purchase and held; a substantial modification makes the owner its manufacturer. |
| Safety references |
|
What each regime attaches, and who it binds
57 clauses across 5 regimes, on the class defaultsShown on a register for the regimes you tick; with none ticked, the IEC 62443 asset-owner rows are the default. The CRA row is informational on every connected asset. Requirement text drawn from a human-verified compliance corpus under licence: the corpus statement of each clause, not the instrument verbatim.
IEC 62443
Binds Part 2-1 binds the asset owner; Part 3-2 is the owner's zoning and risk assessment; Part 3-3 is what the owner specifies for the system. Part 2-4 binds the service provider and Parts 4-1 and 4-2 the product supplier, so those rows are rendered as what to ask. Source framework: IEC 62443.
| Asset owner duty | On every asset (Part 2-1) IEC 62443 2-1 AC · 2-1 BCP · 2-1 CSMS · 2-1 IR · 2-1 MOC · 2-1 NSEG · 2-1 PHY · 2-1 PM · 2-1 RA · 2-1 TRN Whatever the zone, these ten programme duties are the owner's for every asset in the system under consideration. |
|---|---|
| Asset owner duty | System requirements to specify for a cell zone (Part 3-3) IEC 62443 3-3 SR 1.1 · 3-3 SR 2.1 · 3-3 SR 3.4 · 3-3 SR 5.1 · 3-3 SR 7.6 The cell zone is the smallest a conduit is drawn at; the requirements the owner writes into the CRS for it are identification, use control, integrity of the controller program, restricted data flow and a maintained configuration. |
| Asset owner duty | Added where the asset is on a network IEC 62443 3-3 SR 3.1 · 3-3 SR 5.2 · 3-3 SR 6.2 Communication integrity, a monitored zone boundary and continuous monitoring attach the moment the asset is reachable. |
| Ask the integrator | Part 2-4 binds the service provider, not the owner IEC 62443 2-4 SP-01 · 2-4 SP-02 · 2-4 SP-03 · 2-4 SP-04 · 2-4 SP-05 · 2-4 SP-06 The owner owes none of these rows; the owner asks the integrator and the maintenance provider for the evidence of each before commissioning and at every substantial change. |
| Ask the supplier | Part 4-1 binds the supplier, not the owner IEC 62443 4-1 DM · 4-1 SG · 4-1 SUM The owner asks the maker of the controller or the machine for the hardening guide, the vulnerability handling process and the signed update channel. |
| Ask the supplier | Part 4-2 binds the supplier: a networked component IEC 62443 4-2 CR-1-1 · 4-2 EDR-3-10 For a networked controller the owner also asks for signed firmware with rollback protection and user authentication on the component. |
NIST SP 800-82 Rev 3
Binds guidance addressed to the operator of the OT environment: it binds nobody in law and is what most OT security programmes are assessed against. Source framework: NIST SP 800-82 Rev 3.
| Asset owner duty | The OT overlay on every asset SP 800-82 GOV-3 · HOST-4 · HOST-6 · IR-1 · MON-2 SP 800-82 is guidance for the operator of the OT environment: an inventory that holds firmware and location, safety and security run together, change and patch management, and an incident plan with OT scenarios. |
|---|---|
| Asset owner duty | Network architecture where the asset is on a network SP 800-82 ARCH-1 · ARCH-2 · NET-1 Zones and conduits, an industrial DMZ between the plant and the office, and deny-by-default rules between zones. |
| Asset owner duty | Field devices in a cell or line zone SP 800-82 IAM-4 · PHYS-1 Where a controller has little or no logical authentication, the key switch, the locked cabinet and the seal are the control. |
The EU Machinery Regulation
Binds the manufacturer of the machine, and whoever substantially modifies it; the owner's row is what to demand at purchase and hold, and what it becomes liable for on a substantial modification. Source framework: the EU Machinery Regulation.
| Asset owner duty | What to demand at purchase and hold (the Regulation binds the manufacturer) Machinery Reg Art. 10 · Art. 20 · Art. 21, 22 · Art. 51, 52, 53, 54 The declaration of conformity, the technical documentation and the instructions are the manufacturer's to draw up. The owner's row is to demand them at purchase, to hold the declaration and the instructions for the life of the machine, and to know that the Regulation applies to machines placed on the market from its application date, with the Directive before it. |
|---|---|
| Asset owner duty | At every substantial modification Machinery Reg Art. 17, 18, 19 An owner that substantially modifies a machine becomes its manufacturer for the modification and takes on the Article 10 duties: the risk assessment, the technical file and the declaration are then the owner's to produce. |
| Ask the supplier | What the manufacturer shows (Articles 8 and 9 bind the manufacturer) Machinery Reg Art. 8, 9 · Art. 25 The essential health and safety requirements, including protection against corruption of the control system and the provisions for autonomous behaviour, and the conformity assessment route the machine went through. |
The EU Cyber Resilience Act
Binds manufacturers, importers and distributors of products with digital elements; never the owner using them. Source framework: the EU Cyber Resilience Act.
| Ask the supplier | From the application date (the CRA binds manufacturers) CRA Art. 13 and Annex I · Art. 69, 70, 71 A connected controller or machine with digital elements is a product with digital elements; the manufacturer owes the essential cybersecurity requirements, a support period with security updates and vulnerability handling. The owner asks for the support period and the update channel. Informational: the owner owes no CRA clause. |
|---|
ISO/IEC 27001:2022
Binds the organisation that holds the certificate, through the Annex A controls it declared applicable. Source framework: ISO/IEC 27001:2022.
| Asset owner duty | Supplier and change controls on every asset ISO 27001 5.19 · 5.20 · 5.22 · 8.32 The integrator and the maintenance provider are suppliers; the change to a machine is a change. |
|---|---|
| Asset owner duty | Network controls where the asset is on a network ISO 27001 5.21 · 8.9 · 8.20 · 8.21 · 8.22 Network security, the services on it, segregation and a secure configuration baseline attach to any connected asset; the ICT supply chain control attaches to what the supplier delivers into it. |
The EU AI Act
A fixed-program machine is not an AI system: it does not infer from input how to generate its output and it does not learn or re-plan at runtime. No AI Act row attaches to it; the Machinery Regulation and IEC 62443 do.
Runtime attestation: what to ask the supplier for
Signed firmware and updates with rollback protection, an attested boot or integrity check the controller reports, and behaviour logs that can be read off the device. The register asks; it does not say the supplier provides any of it. CRA Art. 13 and Annex I IEC 62443 3-3 SR 3.3 · 3-3 SR 3.4 · 4-1 SUM · 4-2 EDR-3-10
Ask the integrator
- How the cell entry is interlocked with the positioner as well as the arm
- Where weld programs and parameters are held and who can change them
- What the cell controller exposes on the network
Findings this class can raise
- Remote access into a cell or line zone
A machine in a cell or line zone that the paste says is reached remotely. A remote session into a controller is a conduit from outside the plant into the zone with the least defence; the asset owner controls the account, the broker and the session, and the integrator or supplier answers for what the session can do. - Flat network: networked assets with no zone named
Networked assets whose zone or network column is blank, spread across two or more zone classes. Either the zones exist and the register cannot see them, or they do not: the zone and conduit sheet is the first thing an assessor asks for, and it cannot be drawn from this paste. - A wrong action reaches a person, no safety function noted
A class whose wrong action reaches a person, on a line where the paste names no safety function, guard or scanner. The safety function may exist; the register records that the paste does not name it and lists the standards that govern the class so the integrator can be asked which ones the cell was built to. - No change record on an adaptive or networked asset
An adaptive or networked asset with no commissioning date and no last-change date. Management of change is the control every regime here shares; a register that cannot say when the asset last changed cannot say whether the last change was reviewed. - End of support or unpatched
The paste says the asset is out of support, unpatched or at end of life, or its commissioning year is older than the support threshold in the preamble. The asset owner's row is patch management with a recorded risk acceptance for what cannot be patched; the supplier's row is what to ask about updates and the support period. - Vendor share at or above a third
One vendor behind a third or more of the assets, or behind every asset in a zone class. Concentration is often the right engineering choice; the regimes ask that the dependence be recorded and the supplier relationship managed, not avoided. The register names the share and never rates the vendor. - Machinery declaration or technical file not held
A machine bought or modified after the preamble's threshold date for which the owner records no declaration of conformity or technical file. The declaration is the manufacturer's to draw up and the owner's to hold; a substantial modification makes the modifier the manufacturer, and the file is then the owner's to produce.
Do this for every asset on your floor
Paste the list and get this classification for every asset at once, with the zone and SL-T, the behaviour, the connectivity, the findings and the obligation rows per regime. Eight assets free, no account.
Build my cell register