Safety laser scanner and light curtain

Detects a person entering a hazard zone and tells the safety controller to stop the machine; a safety function, not a sensor.

How the register reads it

Also calledlight curtain, safety laser scanner, area scanner
FamilyInspection and vision
What a wrong action costsperson. A person not detected, which is the case the machine relies on it for.
Zone class and SL-Tsafety SL-T 3 by default. Part of the safety zone with the controller it reports to. Never above 3; the paste may state its own zone name and SL-T.
Networked by defaultNo. Wired to the safety controller; networked only where the paste says so.
Remote access by defaultNo. Not by default.
Behaviour by defaultfixed. Fixed fields.
Machinery RegulationA machine or safety component: the declaration, the technical documentation and the instructions are demanded at purchase and held; a substantial modification makes the owner its manufacturer.
Safety references
  • IEC 61496 electro-sensitive protective equipment: light curtains and laser scanners
  • ISO 13855 positioning of safeguards by approach speed
  • ISO 13849-1 safety-related parts of control systems, performance levels
  • ISO 12100 risk assessment and risk reduction for machinery
Named, not held: the register does not say whether a machine was built to them.

What each regime attaches, and who it binds

42 clauses across 4 regimes, on the class defaults

Shown on a register for the regimes you tick; with none ticked, the IEC 62443 asset-owner rows are the default. The CRA row is informational on every connected asset. Requirement text drawn from a human-verified compliance corpus under licence: the corpus statement of each clause, not the instrument verbatim.

IEC 62443

Binds Part 2-1 binds the asset owner; Part 3-2 is the owner's zoning and risk assessment; Part 3-3 is what the owner specifies for the system. Part 2-4 binds the service provider and Parts 4-1 and 4-2 the product supplier, so those rows are rendered as what to ask. Source framework: IEC 62443.

Asset owner dutyOn every asset (Part 2-1)
IEC 62443 2-1 AC · 2-1 BCP · 2-1 CSMS · 2-1 IR · 2-1 MOC · 2-1 NSEG · 2-1 PHY · 2-1 PM · 2-1 RA · 2-1 TRN
Whatever the zone, these ten programme duties are the owner's for every asset in the system under consideration.
Asset owner dutySystem requirements to specify for the safety zone (Part 3-3)
IEC 62443 3-3 SR 1.2 · 3-3 SR 2.8 · 3-3 SR 3.1 · 3-3 SR 3.4 · 3-3 SR 5.1 · 3-3 SR 5.2
The safety zone accepts no command from the process side: device authentication, auditable events, communication and program integrity, and a boundary that only carries status out.
Ask the integratorPart 2-4 binds the service provider, not the owner
IEC 62443 2-4 SP-01 · 2-4 SP-02 · 2-4 SP-03 · 2-4 SP-04 · 2-4 SP-05 · 2-4 SP-06
The owner owes none of these rows; the owner asks the integrator and the maintenance provider for the evidence of each before commissioning and at every substantial change.
Ask the supplierPart 4-1 binds the supplier, not the owner
IEC 62443 4-1 DM · 4-1 SG · 4-1 SUM
The owner asks the maker of the controller or the machine for the hardening guide, the vulnerability handling process and the signed update channel.

NIST SP 800-82 Rev 3

Binds guidance addressed to the operator of the OT environment: it binds nobody in law and is what most OT security programmes are assessed against. Source framework: NIST SP 800-82 Rev 3.

Asset owner dutyThe OT overlay on every asset
SP 800-82 GOV-3 · HOST-4 · HOST-6 · IR-1 · MON-2
SP 800-82 is guidance for the operator of the OT environment: an inventory that holds firmware and location, safety and security run together, change and patch management, and an incident plan with OT scenarios.
Asset owner dutySafety system isolation
SP 800-82 ARCH-4
The safety instrumented system is separated from the control system and every other network.

The EU Machinery Regulation

Binds the manufacturer of the machine, and whoever substantially modifies it; the owner's row is what to demand at purchase and hold, and what it becomes liable for on a substantial modification. Source framework: the EU Machinery Regulation.

Asset owner dutyWhat to demand at purchase and hold (the Regulation binds the manufacturer)
Machinery Reg Art. 10 · Art. 20 · Art. 21, 22 · Art. 51, 52, 53, 54
The declaration of conformity, the technical documentation and the instructions are the manufacturer's to draw up. The owner's row is to demand them at purchase, to hold the declaration and the instructions for the life of the machine, and to know that the Regulation applies to machines placed on the market from its application date, with the Directive before it.
Asset owner dutyAt every substantial modification
Machinery Reg Art. 17, 18, 19
An owner that substantially modifies a machine becomes its manufacturer for the modification and takes on the Article 10 duties: the risk assessment, the technical file and the declaration are then the owner's to produce.
Ask the supplierWhat the manufacturer shows (Articles 8 and 9 bind the manufacturer)
Machinery Reg Art. 8, 9 · Art. 25
The essential health and safety requirements, including protection against corruption of the control system and the provisions for autonomous behaviour, and the conformity assessment route the machine went through.

ISO/IEC 27001:2022

Binds the organisation that holds the certificate, through the Annex A controls it declared applicable. Source framework: ISO/IEC 27001:2022.

Asset owner dutySupplier and change controls on every asset
ISO 27001 5.19 · 5.20 · 5.22 · 8.32
The integrator and the maintenance provider are suppliers; the change to a machine is a change.

The EU AI Act

A fixed-program machine is not an AI system: it does not infer from input how to generate its output and it does not learn or re-plan at runtime. No AI Act row attaches to it; the Machinery Regulation and IEC 62443 do.

Ask the integrator

  1. What the protective field was set to and who validated the stop distance
  2. Whether the field configuration can be changed over the network
  3. Where the configuration is recorded

Findings this class can raise

Do this for every asset on your floor

Paste the list and get this classification for every asset at once, with the zone and SL-T, the behaviour, the connectivity, the findings and the obligation rows per regime. Eight assets free, no account.